In the Know

Pastel de Choclo: A Mixture of Cultures

Pastel de choclo, or corn pie, is a traditional dish in Chilean cuisine, most popular in the central area and the countryside. The key ingredient is generally a ground beef filling, which is then baked in a tender corn mixture.

According to the Chilean anthropologist Sonia Montecino, this dish originated in colonial times, likely by Mapuche (an Indigenous People from southern Chile) cooks, in the kitchens of Spanish settlers.

Today, it is a favourite dish among many Chileans, especially in the summertime when corn is harvested. Here is one version of the recipe to try at home:

Ingredients

  • 10 large corn (approximately 8 cups) grated or chopped, and then ground
  • 2 cups milk
  • 3 tablespoons oil
  • 3 onions, finely chopped
  • 1 teaspoon each paprika, oregano and cumin
  • 300 grams lean ground beef
  • 2 tablespoons raisins
  • 2 hard-boiled eggs, sliced
  • 12 black olives
  • 3 teaspoons sugar
  • Salt and pepper to taste

1. Cook the ground corn in a saucepan over low heat, stirring constantly until it boils for a few minutes. As it cooks and thickens, slowly add the milk. The result should be a creamy, slightly spreadable paste. If it becomes too thick, add more milk. Season with salt and pepper to taste.

2. Separately, heat the oil in another saucepan and sauté the onions for a few minutes until translucent. Add the paprika, oregano, cumin and ground beef and cook for 10 to 15 minutes on low heat, stirring occasionally.

3. Pour this filling into a baking dish or individual moulds. Sprinkle raisins, egg and olives on top, then cover completely with the freshly prepared corn mixture.

4. Sprinkle the surface with a hint of sugar and heat in a hot oven until the top is warm and browned. Once ready, serve immediately.

Thank You

Download Connect, Volume 25

Many thanks to those who contributed to and participated in this issue of Connect:

Catherine Adair, Community Relations Leader, Trail Operations; Andrés Castillo, Senior Geologist, Highland Valley Copper; Eric Goss, Superintendent, Maintenance, Quebrada Blanca Phase 2; Mark Helms, Mine Engineer, Mine Technical Department, Red Dog Operations; Rob Klein, Senior Engineer, Projects, Water Quality Management, Sparwood office; Andrea Lobos, Senior Communications Specialist, Santiago office; Andrew Milner, Senior Vice President, Innovation and Technology, Vancouver office; Mario Ortiz, Manager, Integrated Operations, Quebrada Blanca Phase 2; Angelique Rosenthal, Environmental Engineer, Trail Operations; Jackie Scales, Director, Inclusion and Diversity, Vancouver office; Stephanie Shaw, Manager, Human Resources, Teck Chile, Santiago office; Nicole Tapia, Communications Specialist, Corporate Affairs, Vancouver office; Herman Urrejola, Social Responsibility Manager, Teck Chile, Santiago office; Verna Westlake, Community Relations Coordinator, Red Dog Operations

Construction cranes over barren land with a large open-pit mine in a desert landscape.

On the Cover

Quebrada Blanca Phase 2 (QB2) will develop the deeper sulphide resource underlying the pre-existing Quebrada Blanca operation. To access the QB2 resource, new infrastructure is being constructed now through to 2021. Read more in “QB2: A Next Phase”.

Submissions

Have a story that you would like to share through Connect? Submit your article and high-quality photos to: connect@teck.com